Achieving CFB Boiler Maintenance Goals
By Integrated Global Services Inc IGS
The pulp Mill in the Eastern United States operates a CFB boiler unit built in 1989. The boiler was recently upgraded from the viewpoint of operating pressures to 450,000lbs/hr.
The fuel type for this particular unit has led to the issues at hand – erosion causing tube leaks and numerous forced outages.